Suspended platform (all models)
Suspended platform(or suspension platform access system), as temporary suspended cradle platform, are widely applied in maintenance applications such as curtain fecade cleaning in high rise building, painting,glazing repairs, bill- board painting, cable installation and other outer working of high rise building up to 150 meters about 30 floors high. Our ZLP series suspended platform cradle, ZLP-1000, ZLP-800, ZLP-630, ZLP-500 and ZLP-250, are good choice for fulfill above outside of wall work.
The specification of Suspended Platform (suspension platform)
Type | ZLP1000 | ZLP800 | ZLP630 | ZLP500 | ZLP250 |
---|---|---|---|---|---|
Working Load Limit | 1000kg | 800kg | 630kg | 500kg | 250kg |
Lifting Speed | 8.7m/min | 9.0m/min | 9.0m/min | 9.0m/min | 9.0m/min |
Voltage-3 phase | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) |
Frequency | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz |
Rated Power | 2.0x2 | 1.8x2 | 1.5x2 | 1.1x2 | 1.1x1 |
Hoist Model | LTD100 | LTD80 | LTD63 | LTD50 | LTD50 |
Safety Lock Model | LSF310 | LSF309 | LSF308 | LSF308 | OSL308 |
Wire Rope | 4x31SW+FC-10.2mm | 4x31SW+FC-9.1mm | 4x31SW+FC-8.3mm | 4x31SW+FC-8.3mm | 4x31SW+FC-8.3mm |
Platform Size (LxWxH) | (2.5x3)x0.76x1.45m | (2.5x3)x0.76x1.45m | (2x3)x0.76x1.45m | (2.5x2)x0.76x1.45m | 1.2x0.65x2.3m |
Weight Of Suspension Jibs | 340kg | 340kg | 340kg | 340kg | 170kg |
Weight Of Lifting Part | 520kg(Steel) 340kg(Aluminium) | 520kg(Steel) 340kg(Aluminium) | 410kg(Steel) 290kg(Aluminum) | 410kg(Steel) 290kg(Aluminum) | 200kg(Steel) 140kg(Aluminum) |
Counter Weight | 1200kg | 1000kg | 900kg | 800kg | 350kg |
20' GP Qty of Package | 10Sets | 10Sets | 10Sets | 9Sets | 9Sets |
The above specification is our standard ones, for voltage, frequency, worktable length can be custom-built as per your country’s requirement.Components of working platform are aluminum, hot dipped galvanized steel,and powered coating steel.
Optional function:
1.Overload sensor inside the hoist
2.Phase controller
Maybe you have different require for the structure of working platform and anchoring on roof ,please visit the website:
Structure of working platform and anchoring on roof